Windpark Flaming is a 33.6MW onshore wind power project. It is located in Brandenburg, Germany. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2016.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 33.6 | 33.6 | – | Active | Brandenburg, Germany | E-Wikom |
---|
Description
The project was developed by E-Wikom and is currently owned by Commerz Real Kapitalverwaltungsgesellschaft.
The Hybrid towers installed at the Windpark Flaming (Windpark Flaming Phase I), site are 140m high.
The Windpark Flaming (Windpark Flaming Phase II(A)), has 140m high towers.
The Windpark Flaming (Windpark Flaming Phase II(B)), has 141m high towers.
The Windpark Flaming (Windpark Flaming Phase III), has 140m high towers.
Development Status
The project is currently active. The project got commissioned in November 2016.
Contractors Involved
Nordex was selected as the turbine supplier for the wind power project. The project consists of 14 units of N117 (2.4 MW) turbines, each with 2.4MW nameplate capacity.
Nordex is the O&M contractor for the Windpark Flaming (Windpark Flaming Phase I). The operation and maintenance contract commenced from 2016, for a period of 15 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.