X-Elio Shiroishi Solar PV Park is a 28.32MW solar PV power project. It is located in Miyagi, Japan. The project is currently active. It has been developed in single phase. The project construction commenced in 2017 and subsequently entered into commercial operation in February 2019.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 28.32 28.32 Active Miyagi, Japan X-ELIO Energy

Description

The project is developed and owned by X-ELIO Energy.

X-Elio Shiroishi Solar PV Park is a ground-mounted solar project which is spread over an area of 49.7 hectares.

The project generates 35.98MWh electricity and supplies enough clean energy to power 10,563 households, offsetting 23.386t of carbon dioxide emissions (CO2) a year. The project cost is $58.619m.

Development Status

The project construction commenced in 2017 and subsequently entered into commercial operation in February 2019.

Contractors Involved

NEC Networks & System Integration was selected to render EPC services for the solar PV power project.

Yingli Green Energy Holding was selected as the supplier of PV modules for the project.

The inverters were procured from Nissin Electric for the project.

NEC Networks & System Integration is the O&M contractor for the solar PV power project. The operation and maintenance contract commenced from 2018, for a period of 20 years.

About X-ELIO Energy

X-ELIO Energy SL (X-ELIO), formerly Gestamp Solar, is a renewable energy company. The company constructs, design, develops, installs, finances and operates solar photovoltaic plants. It offers services such as site selection, feasibility studies, project definitions, construction, transport and assembly, negotiations and project legalization. X-ELIO also provides monitoring, operation and maintenance, project design and investment analysis services. The company is owned by Brookfield Renewable Partners LP and KKR & Co Inc. It has operational presence across the Americas, Africa, the Middle East, Asia Pacific and Europe. X-ELIO is headquartered in Madrid, Spain.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.