Yeonggwang Yawol Offshore Wind Power is a 50MW offshore wind power project. It is planned in Yellow sea, South Jeolla, South Korea. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2026.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Offshore 50 50 Permitting South Jeolla, South Korea Daehan Green Power

Description

The project is being developed by Daehan Green Power and is currently owned by Daehan Green Energy.

The project cost is expected to be around $168.46m.

Development Status

The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2026.

About Daehan Green Power

Daehan Green Power Corp (Daehan Green Power) manufactures and distributes biofuel products that produces renewable diesel and other related products. Daehan Green Power is headquartered in South Korea.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.