Yeongheung Thermal Power Plant, South Korea

By Carmen

Yeongheung Thermal Power Plant is a 5,080MW coal fired power project. It is located in Incheon, South Korea. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2004.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 5,080 5,080 Active Incheon, South Korea

Description

The project is currently owned by Korea South-East Power.

It is a steam turbine power plant that is used for Baseload.

Development Status

The project got commissioned in July 2004.

Content from our partners
Green investment: What gives Scotland multiple advantages
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration

Contractors Involved

Hyundai Engineering was selected to render EPC services for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit V) project. Hyundai Engineering was selected to render EPC services for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit VI) project.

Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit I) is equipped with Doosan Heavy Industries & Construction steam turbine. The phase consists of 1 steam turbine with 800MW nameplate capacity.

Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit II) is equipped with Doosan Heavy Industries & Construction steam turbine. The phase consists of 1 steam turbine with 800MW nameplate capacity.

Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit III) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 870MW nameplate capacity.

Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit IV) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 870MW nameplate capacity.

Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit V) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 870MW nameplate capacity.

Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit VI) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 870MW nameplate capacity.

GE Power supplied Hydrogen and Water Cooled, 3-Phase Synchronous electric generator for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit I).

GE Power supplied Hydrogen and Water Cooled, 3-Phase Synchronous electric generator for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit II).

Mitsubishi Power supplied Hydrogen and Water Cooled, 3-Phase Synchronous electric generator for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit III).

Mitsubishi Power supplied Hydrogen and Water Cooled, 3-Phase Synchronous electric generator for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit IV).

Mitsubishi Power supplied electric generator for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit V).

Mitsubishi Power supplied electric generator for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit VI).

Doosan Heavy Industries & Construction supplied steam boiler for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit I).

Doosan Heavy Industries & Construction supplied steam boiler for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit II).

Doosan Heavy Industries & Construction supplied steam boiler for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit III).

Doosan Heavy Industries & Construction supplied steam boiler for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit IV).

Doosan Heavy Industries & Construction supplied steam boiler for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit V).

Doosan Heavy Industries & Construction supplied steam boiler for the Yeongheung Thermal Power Plant (Yeongheung Coal Fired Power Plant Unit VI).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU