Yokohama Combined Cycle Power Plant is a 3,016MW gas fired power project. It is located in Kanagawa, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 1996.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 3,016 | 3,016 | – | Active | Kanagawa, Japan |
---|
Description
The project is currently owned by JERA with a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant.
Development Status
The project got commissioned in June 1996.
Contractors Involved
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block I) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block II) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block III) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block V) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block V) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VI) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VI) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VII) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VII) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VIII) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VIII) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Unit IV) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 125MW nameplate capacity.
Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Unit IV) is equipped with GE Power 9F.03 gas turbine. The phase consists of 1 gas turbine with 252MW nameplate capacity.
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block I).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block II).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block III).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block V).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VI).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VII).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VIII).
GE Power supplied electric generator for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Unit IV).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block I).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block II).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block III).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block V).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VI).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VII).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Block VIII).
GE Power supplied steam boiler for the Yokohama Combined Cycle Power Plant (Yokohama Combined Cycle Power Plant Unit IV).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.