Zhangshan Coal Fired Power Plant is a 1,800MW coal fired power project. It is located in Shanxi, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2004. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Zhangshan Coal Fired Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

Beijing Energy Investment Holding and Shanxi International Power Group are currently owning the project having ownership stake of 55% and 45% respectively.

It is a Steam Turbine power plant that is used for Baseload.

Development status

The project got commissioned in October 2004.

Contractors involved

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I) is equipped with Harbin Turbine NZK300-16.7/537/537 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II) is equipped with Harbin Turbine NZK300-16.7/537/537 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I) is equipped with Shanghai Turbine N600-16.67 / 538/538 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II) is equipped with Shanghai Turbine N600-16.67 / 538/538 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Beijing Beizhong Steam Turbine Generator supplied 7A300-46 electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I).

Beijing Beizhong Steam Turbine Generator supplied 7A300-46 electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I).

Beijing Beizhong Steam Turbine Generator supplied TA255-460 electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II).

Beijing Beizhong Steam Turbine Generator supplied TA255-460 electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II).

Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I).

Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I).

Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II).

Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II).

Wuhan Boiler supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I).

Wuhan Boiler supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I).

Wuhan Boiler supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II).

Wuhan Boiler supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II).

Shanghai Boiler Works supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I).

Shanghai Boiler Works supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I).

Shanghai Boiler Works supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II).

Shanghai Boiler Works supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II).

For more details on Zhangshan Coal Fired Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.