Zhangshan Coal Fired Power Plant is a 1,800MW coal fired power project. It is located in Shanxi, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2004.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 1,800 1,800 Active Shanxi, China

Description

Beijing Energy Investment Holding and Shanxi International Power Group are currently owning the project having ownership stake of 55% and 45% respectively.

It is a steam turbine power plant that is used for Baseload.

Development Status

The project got commissioned in October 2004.

Contractors Involved

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I) is equipped with Harbin Turbine NZK300-16.7/537/537 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II) is equipped with Harbin Turbine NZK300-16.7/537/537 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I) is equipped with Shanghai Turbine N600-16.67 / 538/538 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II) is equipped with Shanghai Turbine N600-16.67 / 538/538 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Beijing Beizhong Steam Turbine Generator supplied 7A300-46 electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I).

Beijing Beizhong Steam Turbine Generator supplied TA255-460 electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II).

Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I).

Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II).

Wuhan Boiler supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit I).

Wuhan Boiler supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase I Unit II).

Shanghai Boiler Works supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit I).

Shanghai Boiler Works supplied steam boiler for the Zhangshan Coal Fired Power Plant (Zhangshan Coal Fired Power Plant Phase II Unit II).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.