Zolling Biomass Power Plant is a 20MW biopower project. It is located in Bavaria, Germany. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2003.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 20 20 Active Bavaria, Germany

Description

The project is co-owned by E.ON Climate & Renewables and Engie, with their respective ownership stake of 50% each.

Wood waste which is a kind of wood by-product is used as a feedstock to power the project.

Development Status

The project got commissioned in 2003.

Contractors Involved

Alstom supplied steam boiler for the project. The boiler installed at the site has a capacity of 70TPH. The temperature witnessed inside the boiler is around 470°C. The steam is pressurized inside the boiler at 74bar.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.