Kajiwa is a 452.4MW hydro power project. It is located on Muli river/basin in Sichuan, China. The project is currently active. It has been developed in single phase. The project commenced construction in 2011.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 452.4 452.4 Active Sichuan, China Huadian Muli River Hydropower Development

Description

The project is developed and owned by Huadian Muli River Hydropower Development. The company has a stake of 100%.

Kajiwa is a reservoir based project. The hydro reservoir capacity is 375 million cubic meter. The project generated 1,991 GWh of electricity. The project cost is $821.8m.

The hydro power project consists of 2 turbines, each with 6.2MW nameplate capacity.

The hydro power project consists of 4 turbines, each with 110MW nameplate capacity.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project has 6 electric generators installed at the site.

Development Status

The project commenced construction in 2011.

Power Purchase Agreement

The power generated from the project is sold to State Grid Corporation of China under a power purchase agreement.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.