Round Butte is a 372.5MW hydro power project. It is located on Deschutes river/basin in Oregon, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1964.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 372.5 | 372.5 | – | Active | Oregon, the US |
---|
Description
The project is currently owned by Portland General Electric with a stake of 66.67%.
The hydro reservoir capacity is 659.91 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The penstock diameter is 4.267m. The project generated 997.892 GWh of electricity.
The hydro power project consists of 1 turbine with 112.5MW nameplate capacity.
The hydro power project consists of 2 turbines, each with 130MW nameplate capacity.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project has 3 electric generators installed at the site.
Development Status
The project got commissioned in 1964.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.