Tumut 2 is a 286.4MW hydro power project. It is located on Tumut river/basin in New South Wales, Australia. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1961.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 286.4 286.4 Active New South Wales, Australia

Description

The project is currently owned by Snowy Hydro.

The hydro reservoir capacity is 1.5 million cubic meter. The net head of the project is 262.1m.

Development Status

The project got commissioned in 1961.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Contractors Involved

Toshiba Energy Systems and Solutions was selected as the turbine supplier for the hydro power project. The company provided 4 turbines, each with 71.5MW nameplate capacity.

GE Renewable Energy supplied 4 electric generators for the project. The generator capacity is 75.7 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.