Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. Greece had 13,663Ckm of line length in 2023 and this is expected to rise to 15,038Ckm by 2028. Listed below are the five largest transmission projects by line length in Greece, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Attica – Crete HVDC Line
The Attica – Crete HVDC Line is a 500kV underground line with a length of 335Ckm running from Attica Converter Station, Attica to Damasta Substation, Crete. The project is under construction and is expected to be commissioned in 2024.
The Attica – Crete HVDC Line is an underground line that will be operated by IPTO. The line will carry direct current (DC) through double circuit cable. Buy the profile here.
2. Agra – Amynteou – Lagada Line
The Agra – Amynteou – Lagada Line is a 400kV underground line with a length of 25.2Ckm running from Agra to Lagada. The project is under construction and is expected to be commissioned in 2024.
The Agra – Amynteou – Lagada Line is an underground line that will be operated by IPTO. The line will carry alternating current (AC) Buy the profile here.
3. Koumoundourou – Corinth Line
The Koumoundourou – Corinth Line is a 400kV overheadKoumoundourou to Corinth. The project is planned and is expected to be commissioned in 2025.
The Koumoundourou – Corinth Line is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Patras – Megalopolis Line – New – 400 kV
The Patras – Megalopolis Line – New – 400 kV is a 400kV overhead line with a length of 4.2Ckm running from Patras to Megalopolis. The project is under construction and is expected to be commissioned in 2024.
The Patras – Megalopolis Line – New – 400 kV is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Patras – Megalopolis Line – Upgrade – 400 kV
The Patras – Megalopolis Line – Upgrade – 400 kV is a 400kV overhead line with a length of 4.4Ckm running from Patras to Megalopolis. The project is proposed and is expected to be commissioned in 2027.
The Patras – Megalopolis Line – Upgrade – 400 kV is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.