Global transmission line length was estimated to have reached 5,465,957Ckm, while Greece had 12,585Ckm of line length by the end of 2021. Listed below are the five largest transmission projects by line length in Greece, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Attica – Crete HVDC Line
The Attica – Crete HVDC Line is a 500kV underground line with a length of 335Ckm running from Attica Converter Station, Attica to Damasta Substation, Crete. The project is under construction and is expected to be commissioned in 2023.
The Attica – Crete HVDC Line is an underground line that will be operated by IPTO. The line will carry direct current (DC) through double circuit cable. Buy the profile here.
2. Langadas – Santas Line
The Langadas – Santas Line is a 400kV overheadLangadas to Santas. The project is under construction and is expected to be commissioned in 2023.
The Langadas – Santas Line is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Patras – Megalopolis – Corinth Line
The Patras – Megalopolis – Corinth Line is a 400kV overheadPatras to Corinth. The project is under construction and is expected to be commissioned in 2023.
The Patras – Megalopolis – Corinth Line is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Patras – Megalopolis Line – New – 400 kV
The Patras – Megalopolis Line – New – 400 kV is a 400kV overhead line with a length of 4.2Ckm running from Patras to Megalopolis. The project is proposed and is expected to be commissioned in 2028.
The Patras – Megalopolis Line – New – 400 kV is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Trikala – Larisa Line
The Trikala – Larisa Line is a 400kV overheadTrikala to Larisa. The project is proposed and is expected to be commissioned in 2027.
The Trikala – Larisa Line is an overhead line that will be operated by IPTO. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.