View all newsletters
Receive our newsletter - data, insights and analysis delivered to you
  1. SA Robotics
15 April 2009

SA Robotics to Provide Pre-Conceptual Design Report for Small Container Underwater-Loading System

SA Robotics is providing a Pre-Conceptual Design Report for CH2MHILL Plateau Remediation’s small container underwater-loading system at K-Basin, Richland, WA. The report will be developed under the assumption that the system will operate within the existing K-West Basin and be operated by personnel at a level 20ft 9in above the equipment.

The concept shall be developed with the idea that the canister will be submerged underwater to overcome the static water head to fill the small container. Design documentation will be provided detailing the final configuration of the pre-concept design for the small container underwater-loading system.

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU

Thank you for subscribing to Power Technology