SA Robotics is providing a Pre-Conceptual Design Report for CH2MHILL Plateau Remediation’s small container underwater-loading system at K-Basin, Richland, WA. The report will be developed under the assumption that the system will operate within the existing K-West Basin and be operated by personnel at a level 20ft 9in above the equipment.

The concept shall be developed with the idea that the canister will be submerged underwater to overcome the static water head to fill the small container. Design documentation will be provided detailing the final configuration of the pre-concept design for the small container underwater-loading system.