Skip to site menu Skip to page content

Subscribed

You have successfully submitted your enquiry. Someone from our company will respond ASAP

Case Study: Maximising Flexibility in Multi-Layered Cascades

Case Study: Maximising Flexibility in Multi-Layered Cascades-feature-image

aventron, a leading Swiss producer of renewable energy, partnered with HYDROGRID to optimize the use of water in their Nordic hydropower plant fleet. This case study highlights how automated, digitally optimized production planning can enhance storage flexibility and enable flexible dispatch, ultimately maximizing efficiency and profitability.

Discover how a leading renewable energy provider boosted flexibility and revenue across its Nordic hydro fleet — without adding operational overhead.

What’s inside:

  • How aventron tackled bottlenecks in a dual-level cascade system
  • The role of automation in winter readiness and inflow forecasting
  • Real-world results: 37% revenue increase with no extra OpEx
  • A behind-the-scenes look at price-driven dispatch in action

Get the case study

 

Related Content