Innovative Large Silo Storage Systems
With more than 160 Eurosilos built around the world and more than 50 years of...
ESI Eurosilo has announced that the first petcoke has been loaded into the brand new Eurosilo storage facility built in Oman.
The specific erection procedure for the two silos was designed in close cooperation with main contractor Larsons and Toubro. The roof structure was built at the silo floor and was then hoisted with the complete materials handling equipment from the inside to the top of the silos.
During the building phase, ESI Eurosilo’s supervisor was stationed at the plant site to lead the building process.
The two Eurosilos will buffer between an input of pet coke at 80tph and a periodic output of 1,000tph demand to provide more logistic flexibility to the plant.
With more than 160 Eurosilos built around the world and more than 50 years of...
In November, shipment inspections to the new thermal power plant in Seocheon, South Korea, construction...
The new plant built by MHPS-E at the RTU thermal power facility in Bosnia and...
ESI Eurosilo recently received its biggest ever order with the request for three large coal...