Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. India had 733,814Ckm of line length in 2023 and this is expected to rise to 890,169Ckm by 2028. Listed below are the five largest transmission projects by line length in India, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Wardha – Aurangabad Line
The Wardha – Aurangabad Line is a 1,200kV overhead line with a length of 696Ckm running from Wardha to Aurangabad. The project is under construction and is expected to be commissioned in 2024.
The Wardha – Aurangabad Line is an overhead line that will be operated by Power Grid Corporation of India. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Amroha – Gajraula Line
The Amroha – Gajraula Line is a 765kV overhead line with a length of 25Ckm running from Amroha to Gajraula. The project is under construction and is expected to be commissioned in 2024.
The Amroha – Gajraula Line is an overhead line that will be operated by Uttar Pradesh Power Transmission. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Bilhaur – Sandila Line
The Bilhaur – Sandila Line is a 765kV overheadBilhaur to Sandila. The project is under construction and is expected to be commissioned in 2024.
The Bilhaur – Sandila Line is an overhead line that will be operated by Uttar Pradesh Power Transmission. The line will carry alternating current (AC) through single circuit cable. Buy the profile here.
4. Dhuvaran – Chharodi Line
The Dhuvaran – Chharodi Line is a 765kV overhead line with a length of 240Ckm running from Dhuvaran to Chharodi. The project is planned and is expected to be commissioned in 2025.
The Dhuvaran – Chharodi Line is an overhead line that will be operated by Gujarat Energy Transmission. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Dopaha – Varanasi Line
The Dopaha – Varanasi Line is a 765kV overheadDopaha to Varanasi. The project is under construction and is expected to be commissioned in 2024.
The Dopaha – Varanasi Line is an overhead line that will be operated by Uttar Pradesh Power Transmission. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.