Global transmission line length was estimated to have reached 5,465,957Ckm, while Myanmar had 21,033Ckm of line length by the end of 2021. Listed below are the five largest transmission projects by line length in Myanmar, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

1. Meikhtila – Taungoo Line

The Meikhtila – Taungoo Line is a 500kV overhead line with a length of 234Ckm running from Meikhtila to Taungoo. The project is under construction and is expected to be commissioned in 2024.

The Meikhtila – Taungoo Line is an overhead line that will be operated by Ministry of Electricity and Energy, Myanmar. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

2. Phayagyi – Hlaingtharyar Line

The Phayagyi – Hlaingtharyar Line is a 500kV overhead line with a length of 96.56Ckm running from Phayagyi to Hlaingtharyar. The project is planned and is expected to be commissioned in 2023.

The Phayagyi – Hlaingtharyar Line is an overhead line that will be operated by Ministry of Electricity and Energy, Myanmar. The line will carry alternating current (AC) through single circuit cable. Buy the profile here.

3. Phayargyi – Nangsam Line

The Phayargyi – Nangsam Line is a 500kV overhead line with a length of 402.25Ckm running from Phayargyi to Nangsam. The project is under construction and is expected to be commissioned in 2025.

The Phayargyi – Nangsam Line is an overhead line that will be operated by Ministry of Electricity and Energy, Myanmar. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

4. Shweli III – Kankaung Line

The Shweli III – Kankaung Line is a 500kV overhead line with a length of 418.34Ckm running from Shweli to Kankaung. The project is planned and is expected to be commissioned in 2024.

The Shweli III – Kankaung Line is an overhead line that will be operated by Ministry of Electricity and Energy, Myanmar. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

5. Taungoo – Phayagyi Line

The Taungoo – Phayagyi Line is a 500kV overhead line with a length of 188.29Ckm running from Taungoo to Phayagyi. The project is under construction and is expected to be commissioned in 2023.

The Taungoo – Phayagyi Line is an overhead line that will be operated by Ministry of Electricity and Energy, Myanmar. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.