Global transmission line length was estimated to have reached 5,465,957Ckm, while Poland had 15,814Ckm of line length by the end of 2021. Listed below are the five largest transmission projects by line length in Poland, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Byczyna – Podborne Line
The Byczyna – Podborne Line is a 1,020kV overheadByczyna to Podborne. The project is proposed and is expected to be commissioned in 2031.
The Byczyna – Podborne Line is an overhead line that will be operated by Polskie Sieci Elektroenergetyczne. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Byczyna – Podborze Line – New – 400 kV
The Byczyna – Podborze Line – New – 400 kV is a 400kV overheadByczyna to Podborze. The project is proposed and is expected to be commissioned in 2030.
The Byczyna – Podborze Line – New – 400 kV is an overhead line that will be operated by Polskie Sieci Elektroenergetyczne. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Jasiniec – Grudziadz Line
The Jasiniec – Grudziadz Line is a 400kV overhead line with a length of 74Ckm running from Jasiniec to Grudziadz. The project is under construction and is expected to be commissioned in 2023.
The Jasiniec – Grudziadz Line is an overhead line that will be operated by Polskie Sieci Elektroenergetyczne. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Ostroleka – Stanislawow Line
The Ostroleka – Stanislawow Line is a 400kV overheadOstroleka to Stanislawow. The project is planned and is expected to be commissioned in 2024.
The Ostroleka – Stanislawow Line is an overhead line that will be operated by Polskie Sieci Elektroenergetyczne. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Pasikurowice – Czarna Line
The Pasikurowice – Czarna Line is a 400kV overhead line with a length of 60Ckm running from Pasikurowice to Czarna. The project is under construction and is expected to be commissioned in 2023.
The Pasikurowice – Czarna Line is an overhead line that will be operated by Polskie Sieci Elektroenergetyczne. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.