Global transmission line length was estimated to have reached 5,615,818Ckm by the end of 2022 and is forecasted to grow to 6,666,393Ckm by 2028. Saudi Arabia had 93,895Ckm of line length in 2022 and this is expected to rise to 103,982Ckm by 2028. Listed below are the five largest transmission projects by line length in Saudi Arabia, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Global transmission line project profiles

Buy the profiles

Premium Insights

The gold standard of business intelligence.

Find out more

1. Aqaba – Tabuk HVDC Line

The Aqaba – Tabuk HVDC Line is a 500kV overhead line with a length of 227.79Ckm running from Aqaba Gulf Transition Station to Tabuk Converter Station, Tabuk. The project is planned and is expected to be commissioned in 2024.

The Aqaba – Tabuk HVDC Line is an overhead line that will be operated by Saudi Electricity. The line will carry direct current (DC) through single circuit cable. Buy the profile here.

2. Abu Hadriyah – Manifa Line

The Abu Hadriyah – Manifa Line is a 380kV overheadAbu Hadriyah to Manifa. The project is under construction and is expected to be commissioned in 2024.

The Abu Hadriyah – Manifa Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through double circuit cable.

3. Al Jillah – Dawadmi Line

The Al Jillah – Dawadmi Line is a 380kV overheadAl Jillah to Dawadmi. The project is under construction and is expected to be commissioned in 2024.

The Al Jillah – Dawadmi Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through single circuit cable.

4. Buhairah – Tabouk Line

The Buhairah – Tabouk Line is a 380kV overhead line with a length of 20Ckm running from Al Buhairah Substation, Tabouk to Tapping point of Tabouk – Tabarja Line. The project is planned and is expected to be commissioned in 2025.

The Buhairah – Tabouk Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through double circuit cable.

5. Tabuk – Tabarjal Line

The Tabuk – Tabarjal Line is a 380kV overheadTabuk to Tabarjal. The project is under construction and is expected to be commissioned in 2024.

The Tabuk – Tabarjal Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.