Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. The Czech Republic had 5,874Ckm of line length in 2023 and this is expected to rise to 6,006Ckm by 2028. Listed below are the five largest transmission projects by line length in the Czech Republic, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Chodov – Cechy Stred Line
The Chodov – Cechy Stred Line is a 400kV overhead line with a length of 35.1Ckm running from Chodov to Cechy Stred. The project is proposed and is expected to be commissioned in 2027.
The Chodov – Cechy Stred Line is an overhead line that will be operated by CEPS. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Hradec – Chrast Line
The Hradec – Chrast Line is a 400kV overhead line with a length of 82.4Ckm running from Hradec to Chrast. The project is proposed and is expected to be commissioned in 2029.
The Hradec – Chrast Line is an overhead line that will be operated by CEPS. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Nosovice – Albrechtice Line
The Nosovice – Albrechtice Line is a 400kV overhead line with a length of 16.5Ckm running from Nosovice to Albrechtice. The project is planned and is expected to be commissioned in 2024.
The Nosovice – Albrechtice Line is an overhead line that will be operated by CEPS. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Nosovice – Kletne Line
The Nosovice – Kletne Line is a 400kV overhead line with a length of 29Ckm running from Nosovice to Kletne. The project is proposed and is expected to be commissioned in 2030.
The Nosovice – Kletne Line is an overhead line that will be operated by CEPS. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Praha Sever – Cechy Stred – Vyskov Line
The Praha Sever – Cechy Stred – Vyskov Line is a 400kV overhead line with a length of 13Ckm running from Praha Sever to Vyskov. The project is proposed and is expected to be commissioned in 2025.
The Praha Sever – Cechy Stred – Vyskov Line is an overhead line that will be operated by CEPS. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.