Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. The Philippines had 21,200Ckm of line length in 2023 and this is expected to rise to 22,325Ckm by 2028. Listed below are the five largest transmission projects by line length in the Philippines, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Balingueo – Balaoan Line
The Balingueo – Balaoan Line is a 500kV overhead line with a length of 89Ckm running from Balingueo to Balaoan. The project is proposed and is expected to be commissioned in 2028.
The Balingueo – Balaoan Line is an overhead line. through 228609 circuit cable. Buy the profile here.
2. Naga – Daraga – BacMan Line
The Naga – Daraga – BacMan Line is a 500kV overhead line with a length of 120Ckm running from Naga to Bacon-Manito Geothermal Power Plant, Sorsogon. The project is proposed and is expected to be commissioned in 2040.
The Naga – Daraga – BacMan Line is an overhead line. through 228609 circuit cable. Buy the profile here.
3. Nagsaag – San Jose – Marilao Line
The Nagsaag – San Jose – Marilao Line is a 500kV overhead line with a length of 8.7Ckm running from Nagsaag to Marilao. The project is planned and is expected to be commissioned in 2024.
The Nagsaag – San Jose – Marilao Line is an overhead line. through 228609 circuit cable. Buy the profile here.
4. Nagsaag – Santiago Line
The Nagsaag – Santiago Line is a 500kV overhead line with a length of 140Ckm running from Nagsaag to Santiago. The project is proposed and is expected to be commissioned in 2027.
The Nagsaag – Santiago Line is an overhead line. through 228609 circuit cable. Buy the profile here.
5. Pagbilao – Tayabas Line – New – 500 kV
The Pagbilao – Tayabas Line – New – 500 kV is a 500kV overhead line with a length of 21Ckm running from Pagbilao to Tayabas. The project is planned and is expected to be commissioned in 2025.
The Pagbilao – Tayabas Line – New – 500 kV is an overhead line. through 228609 circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.