Global transmission capacity was estimated to have reached 21,846,736MVA by the end of 2022 and is forecasted to grow to 28,915,469MVA by 2028. Ghana had 11,157MVA of capacity in 2022 and this is expected to rise to 19,098MVA by 2028. Listed below are the five largest transmission projects by capacity in Ghana, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Dunkwa Substation
Dunkwa Substation is a 330/161kV substation located at Dunkwa, Central Region, Ghana. The substation is planned and is expected to be commissioned in 2025. The Dunkwa Substation will be operated by Ghana Grid Co Ltd.
The designed voltage level of the substation is 330/161kV and the operating voltage level is 330/161kV. The step in voltage of the project is 330kV and the step out voltage is 161kV.
Dunkwa Substation is owned by Ghana Grid Co Ltd. Buy the profile here.
2. Volta Substation
Volta Substation is a 330/161kV substation located at Volta, Volta, Ghana. The substation is under construction and is expected to be commissioned in 2024. The Volta Substation will be operated by Ghana Grid Co Ltd.
The designed voltage level of the substation is 330/161kV and the operating voltage level is 330/161kV. The step in voltage of the project is 330kV and the step out voltage is 161kV.
Volta Substation is owned by Ghana Grid Co Ltd. Buy the profile here.
3. Prestea Substation
Prestea Substation is a 225/161kV substation located at Prestea, Western Region, Ghana. The substation is planned and is expected to be commissioned in 2024. The Prestea Substation will be operated by Ghana Grid Co Ltd.
The designed voltage level of the substation is 225/161kV and the operating voltage level is 225/161kV. The step in voltage of the project is 225kV and the step out voltage is 161kV.
Prestea Substation is owned by Ghana Grid Co Ltd. Buy the profile here.
4. Berekum Substation
Berekum Substation is a 34.5/11kV substation located at Berekum, Brong-Ahafo, Ghana. The substation is under construction and is expected to be commissioned in 2024. The Berekum Substation will be operated by Ghana Grid Co Ltd.
The designed voltage level of the substation is 34.5/11kV and the operating voltage level is 34.5/11kV. The step in voltage of the project is 34kV and the step out voltage is 11kV. Upon completion, the substation will be able to operate at 20MVA.
Berekum Substation is owned by Ghana Grid Co Ltd. Buy the profile here.
5. Techiman Substation
Techiman Substation is a 34.5/11kV substation located at Techiman, South Region, Ghana. The substation is under construction and is expected to be commissioned in 2024. The Techiman Substation will be operated by Ghana Grid Co Ltd.
The designed voltage level of the substation is 34.5/11kV and the operating voltage level is 34.5/11kV. The step in voltage of the project is 34kV and the step out voltage is 11kV. Upon completion, the substation will be able to operate at 20MVA.
Techiman Substation is owned by Ghana Grid Co Ltd. Buy the profile here.
For more details on the latest transmission substation projects, buy the project profiles here.