Global transmission capacity was estimated to have reached 19,883,744MVA by the end of 2021, with Kazakhstan contributing to a capacity of 38,723MVA. Listed below are the five largest transmission projects by capacity in Kazakhstan, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Astana Substation
Astana Substation is a 500kV substation located at Astana, Akmola, Kazakhstan. The substation is under construction and is expected to be commissioned in 2023. The Astana Substation will be operated by Kazakhstan Electricity Grid Operating Company.
The designed voltage level of the substation is 500kV and the operating voltage level is 500kV. The step in voltage of the project is 500kV.
Astana Substation is owned by Kazakhstan Electricity Grid Operating Company.
2. Zhambyl Substation
Zhambyl Substation is a 500kV substation located at Zhambyl, Jambyl, Kazakhstan. The substation is under construction and is expected to be commissioned in 2023. The Zhambyl Substation will be operated by Kazakhstan Electricity Grid Operating Company.
The designed voltage level of the substation is 500kV and the operating voltage level is 500kV. The step in voltage of the project is 500kV.
Zhambyl Substation is owned by Kazakhstan Electricity Grid Operating Company.
3. EEC Substation
EEC Substation is a 220kV substation located at Eurasian Energy Corporation, Pavlodar, Kazakhstan. The substation is under construction and is expected to be commissioned in 2023. The EEC Substation will be operated by Kazakhstan Electricity Grid Operating Company.
The designed voltage level of the substation is 220kV and the operating voltage level is 220kV. The step in voltage of the project is 220kV.
EEC Substation is owned by Kazakhstan Electricity Grid Operating Company.
4. Pavlodar Substation
Pavlodar Substation is a 220kV substation located at Pavlodar City, Pavlodar, Kazakhstan. The substation is under construction and is expected to be commissioned in 2023. The Pavlodar Substation will be operated by Kazakhstan Electricity Grid Operating Company.
The designed voltage level of the substation is 220kV and the operating voltage level is 220kV. The step in voltage of the project is 220kV.
Pavlodar Substation is owned by Kazakhstan Electricity Grid Operating Company.
For more details on the latest transmission substation projects, buy the project profiles here.