Global transmission capacity was estimated to have reached 19,883,744MVA by the end of 2021 and is forecasted to grow to 27,052,399MVA by 2027. Slovakia had 11,830MVA of capacity in 2021 and this is expected to rise to 12,300MVA by 2027. Listed below are the five largest transmission projects by capacity in Slovakia, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.

1. Gabcikovo Substation

Gabcikovo Substation is a 400kV substation located at Gabcikovo, Trvana, Slovakia. The substation is under construction and is expected to be commissioned in 2023. The Gabcikovo Substation will be operated by Slovenska elektrizacna prenosova sustava AS.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Gabcikovo Substation is owned by Slovenska elektrizacna prenosova sustava AS. Buy the profile here.

2. Levice Substation

Levice Substation is a 400kV substation located at Levice, Nitra, Slovakia. The substation is under construction and is expected to be commissioned in 2023. The Levice Substation will be operated by Slovenska elektrizacna prenosova sustava AS.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Levice Substation is owned by Slovenska elektrizacna prenosova sustava AS. Buy the profile here.

3. Rimavska Sobota Substation

Rimavska Sobota Substation is a 400kV substation located at Rimavska Sobota, Banska Bystrica, Slovakia. The substation is under construction and is expected to be commissioned in 2023. The Rimavska Sobota Substation will be operated by Slovenska elektrizacna prenosova sustava AS.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Rimavska Sobota Substation is owned by Slovenska elektrizacna prenosova sustava AS. Buy the profile here.

4. Senica Substation

Senica Substation is a 400/110kV substation located at Senica, Trvana, Slovakia. The substation is under construction and is expected to be commissioned in 2023. The Senica Substation will be operated by Slovenska elektrizacna prenosova sustava AS.

The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV.

Senica Substation is owned by Slovenska elektrizacna prenosova sustava AS. Buy the profile here.

5. Velky Dur Substation

Velky Dur Substation is a 400kV substation located at Velky Dur, Levice, Slovakia. The substation is under construction and is expected to be commissioned in 2023. The Velky Dur Substation will be operated by Slovenska elektrizacna prenosova sustava AS.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Velky Dur Substation is owned by Slovenska elektrizacna prenosova sustava AS. Buy the profile here.

For more details on the latest transmission substation projects, buy the project profiles here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.