Global transmission capacity was estimated to have reached 20,397,232MVA by the end of 2022 and is forecasted to grow to 28,341,693MVA by 2028. the Czech Republic had 23,350MVA of capacity in 2022 and this is expected to rise to 24,715MVA by 2028. Listed below are the five largest transmission projects by capacity in the Czech Republic, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Albrechtice Substation
Albrechtice Substation is a 420kV substation located at Albrechtice, Moravian Silesian, the Czech Republic. The substation is proposed and is expected to be commissioned in 2026. The Albrechtice Substation will be operated by CEPS A.S..
The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV.
Albrechtice Substation is owned by CEPS A.S..
2. Babylon Substation
Babylon Substation is a 420kV substation located at Babylon, Plzen, the Czech Republic. The substation is under construction and is expected to be commissioned in 2024. The Babylon Substation will be operated by CEPS A.S..
The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV.
Babylon Substation is owned by CEPS A.S.. Buy the profile here.
3. Cechy Stred Substation
Cechy Stred Substation is a 420kV substation located at Cechy Stred, Prague, the Czech Republic. The substation is under construction and is expected to be commissioned in 2024. The Cechy Stred Substation will be operated by CEPS A.S..
The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV.
Cechy Stred Substation is owned by CEPS A.S.. Buy the profile here.
4. Detmarovice Substation – New – 420 kV
Detmarovice Substation – New – 420 kV is a 420kV substation located at Detmarovice, Moravian Silesian, the Czech Republic. The substation is planned and is expected to be commissioned in 2024. The Detmarovice Substation – New – 420 kV will be operated by CEPS A.S..
The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV and the step out voltage is 110kV. Upon completion, the substation will be able to operate at 700MVA.
Detmarovice Substation – New – 420 kV is owned by CEPS A.S.. Buy the profile here.
5. Hradec Substation
Hradec Substation is a 420kV substation located at Hradec, Hradec Kralove, the Czech Republic. The substation is proposed and is expected to be commissioned in 2033. The Hradec Substation will be operated by CEPS A.S..
The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV.
Hradec Substation is owned by CEPS A.S..
For more details on the latest transmission substation projects, buy the project profiles here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.