MET and Termokimik Announce Alliance to Bring SCR to North America
MET (Marsulex Environmental Technologies Corporation) and Termokimik Corporation Impianti e Procedimenti Industriali SPA (TKC) have...
With 15 just months available to plan, design, build, erect and start-up a DeNOx system in a power plant, Brindisi Nord one is in an area large enough to host the DeNOx but not without its challenges.
Longevity is the goal in any power plant development and the aim of the Brindisi Nord facility is to be in operation for 30 years. All of this has to be done with no impact on the boiler power production.
This article details the subject, specifically from the design point of view, underlining the importance of the process, the fluid dynamics reproduction through a physic model, the structural design, the equipments selection, the assembly and the start-up challenges.
To find out more, download this free white paper.
MET (Marsulex Environmental Technologies Corporation) and Termokimik Corporation Impianti e Procedimenti Industriali SPA (TKC) have...
This white paper give an overview of Termokimik's experience in particulate removal at coal-fired power...