Thermal Power Station’s Booster for Gas Compressors of Turbines
gat has provided three compressors with common nitrogen supply for two downstream turbine at a...
Over the last 20 years, gat has successfully implemented more than 2,000 projects and gained an excellent reputation as a professional and reliable partner.
With four branches and 130 employees in Germany, with our subsidiary, gat AG (gat corporation) in Switzerland, and with our long-time partners we have
sufficient capacity for handling all stages of projects, from basic engineering to after-sales service.
Our experience ensures you the degree of reliability which is necessary for drawing up automation concepts, requirement specifications and function descriptions as well as their realisation from start to finish.
Download to find out more.
gat has provided three compressors with common nitrogen supply for two downstream turbine at a...
Atlas Copco Energas was commissioned by Infraserv Hoechst to supply a turbo compressor for the...
After supplying four control and monitoring systems for combustion chambers of the production line of...
BASF in Kaisten (Switzerland) has obtained a burner control from gat's North branch. The order...