Abono Power Station is a 921.7MW coal fired power project. It is located in Asturias, Spain. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in March 1974.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 921.7 | 921.7 | – | Active | Asturias, Spain |
---|
Description
The project is currently owned by EDP Espana SAU with a stake of 100%.
It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is bituminous. In case of shortage of bituminous the plant can also run on Natural Gas, Fuel Oil. The fuel is procured from Central Coal Fields of Asturias, Imported Coal.
Development Status
The project got commissioned in March 1974.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Cobra Gestion de Infraestructuras and Mitsubishi Power were selected to render EPC services for the Abono Power Station (Abono Power Station Unit II).
Abono Power Station (Abono Power Station Unit I) is equipped with GE Power Three Part Tandem Condensation Turbine with Reheating steam turbine. The phase consists of 1 steam turbine with 365.5MW nameplate capacity.
Abono Power Station (Abono Power Station Unit II) is equipped with GE Power Four Part Tandem Condensation Turbine with Reheating steam turbine. The phase consists of 1 steam turbine with 556.2MW nameplate capacity.
GE Power supplied Hydrogen and Water Cooled electric generator for the Abono Power Station (Abono Power Station Unit I).
GE Power supplied Hydrogen and Water Cooled electric generator for the Abono Power Station (Abono Power Station Unit II).
Amec Foster Wheeler supplied steam boiler for the Abono Power Station (Abono Power Station Unit I).
Amec Foster Wheeler supplied steam boiler for the Abono Power Station (Abono Power Station Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.