Afsin-Elbistan B Power Plant is a 1,440MW coal fired power project. It is located in Kahramanmaras, Turkey. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2005.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,440 | 1,440 | – | Active | Kahramanmaras, Turkey |
---|
Description
The project is currently owned by Elektrik Uretim.
It is a steam turbine power plant. The fuel is procured from Elbistan Coal Mine.
Development Status
The project got commissioned in 2005.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Babcock Borsig Power, ENKA Insaat ve Sanayi, Mitsubishi Power and Tekfen Holding were selected to render EPC services for the coal fired power project.
Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit I) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit II) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit III) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit IV) is equipped with Mitsubishi Power steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
Mitsubishi Power supplied electric generator for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit I).
Mitsubishi Power supplied electric generator for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit II).
Mitsubishi Power supplied electric generator for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit III).
Mitsubishi Power supplied electric generator for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit IV).
Mitsubishi Power Europe supplied steam boiler for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit I).
Mitsubishi Power Europe supplied steam boiler for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit II).
Mitsubishi Power Europe supplied steam boiler for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit III).
Mitsubishi Power Europe supplied steam boiler for the Afsin-Elbistan B Power Plant (Afsin-Elbistan B Power Plant Unit IV).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.