The Agioi Theodoroi Combined Cycle Power Plant is 457MW gas fired power project. It is planned in Peloponnese, Greece. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 457 457 Permitting Peloponnese, Greece Electric Production Sousaki

Description

The project is being developed and currently owned by Electric Production Sousaki. The company has a stake of 100%.

It is a combined cycle gas turbine (ccgt) power plant.

The project cost is expected to be around $394.208m.

Development Status

The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2024.

About Electric Production Sousaki

Electric Production Sousaki SA (Electric Production Sousaki) generates, transmits and distributes electricity through renewables. It is headquartered in the Greece.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.