Antelope – White River Line is a 345kV overhead line with a length of 83.04km from Antelope, texas, US, to White River, texas, US.
Construction works on the Antelope – White River Line project was commissioned in 2016.
Description
The Antelope – White River Line, which is an overhead line, is being operated by Sharyland Utilities. The Antelope – White River Line is a new line. The line carries alternating current (AC) through double circuit cable.
Approximately $104.3m was financed by the authorities to undertake the construction works of the project.
Antelope – White River Line project development status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataproject works were completed in 2016.
About Sharyland Utilities
Sharyland Utilities LP (Sharyland Utilities) is an electric utility that offers power transmission and distribution services. The utility’s projects include Lubbock Power and Light Integration into Ercot, Crez Project and Second Circuit Upgrade, and Synchronous Condenser Installation in Panhandle. It provides and installs synchronous condensers in Texas to improve grid stability and export capability of the transmission system. Sharyland Utilities collaborates and develops transmission solutions that provides economic and system benefits to the Ercot grid.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.