Aubrey Falls is a 162MW hydro power project. It is located on Mississagi river/basin in Ontario, Canada. The project is currently active. It has been developed in single phase. The project construction commenced in 1966 and subsequently entered into commercial operation in 1969.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 162 | 162 | – | Active | Ontario, Canada |
---|
Description
The project is currently owned by Brookfield Renewable Partners with a stake of 100%.
The net head of the project is 55m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The penstock length is 109.7m. The penstock diameter is 7.7m. The project generated 170.61 GWh of electricity.
Development Status
The project construction commenced in 1966 and subsequently entered into commercial operation in 1969.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataPower Purchase Agreement
The power generated from the project is sold to Ontario Power Authority under a power purchase agreement from 2009. The contracted capacity is 162MW.
Contractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines.
Andritz Hydro supplied 2 electric generators for the project. The generator capacity is 68.5 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.