Ba Ria Combined Cycle Power Plant is a 342.1MW gas fired power project. It is located in Ba Ria-Vung Tau, Vietnam. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in March 1999.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 342.1 342.1 Active Ba Ria-Vung Tau, Vietnam

Description

The project is currently owned by Ba Ria Thermal Power.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from Cuu Long Basin.

Ba Ria Combined Cycle Power Plant (Ba Ria Combined Cycle Power Plant Block I) consists of 3 gas turbines with 37.5MW nameplate capacity.

Ba Ria Combined Cycle Power Plant (Ba Ria Combined Cycle Power Plant Block I) consists of 1 steam turbine with 58MW nameplate capacity.

Ba Ria Combined Cycle Power Plant (Ba Ria Combined Cycle Power Plant Block II) consists of 3 gas turbines with 37.5MW nameplate capacity.

Ba Ria Combined Cycle Power Plant (Ba Ria Combined Cycle Power Plant Block II) consists of 1 steam turbine with 59.1MW nameplate capacity.

Development Status

The project got commissioned in March 1999.

Contractors Involved

Hyundai Engineering was selected to render EPC services for the gas fired power project.

Doosan Heavy Industries & Construction supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.