Begnas-Rupa Storage Project is a 150MW hydro power project. It is planned on Begnas-Rupa river/basin in Gandaki, Nepal. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2027.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 150 | – | 150 | Announced | Gandaki, Nepal | Nepal Electricity Authority |
---|
Description
The project is being developed and currently owned by Nepal Electricity Authority.
Begnas-Rupa Storage Project is a pumped storage project. The gross head of the project will be 60m. The project cost is expected to be around $116.169m.
Development Status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2027.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataAbout Nepal Electricity Authority
Nepal Electricity Authority (NEA) is a power authority that generates, distributes, transmits, and maintains power. The authority’s services include recommending to government of Nepal, policies in the power sector, long and short term plans, recommends, determines, and realizes tariff structure for electricity consumption with prior approval of Government of Nepal. It also provides arrangements for training and study so as to produce skilled manpower in generation, distribution, transmission, and other sectors. NEA constructs, plans, operates, and maintains power generation, transmission and distribution facilities across Nepal. The authority offers its services across Nepal. NEA is headquartered in Kathmandu, Nepal.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.