Beltran Ranch Solar Facility is a 140MW solar PV power project. It is planned in California, the US. The project is currently in permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2022.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 140 140 Permitting California, the US Coldwell Solar

Description

The project is being developed and currently owned by Coldwell Solar.

Beltran Ranch Solar Facility is a ground-mounted solar project which is planned over 606 acres.

The project cost is expected to be around $150.92m.

The solar power project consists of 280,000 modules.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

75 inverters are likely to get installed at the project site.

Development Status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2022.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.