Bhumibol Pumped Storage is a 171MW hydro power project. It is located on Ping river/basin in Tak, Thailand. The project is currently active. It has been developed in single phase. The project construction commenced in 1991 and subsequently entered into commercial operation in 1996.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 171 | 171 | – | Active | Tak, Thailand |
---|
Description
The project is currently owned by Electricity Generating Authority of Thailand with a stake of 100%.
Bhumibol Pumped Storage is a pumped storage project. The hydro reservoir capacity is 13,462 million cubic meter.
Development Status
The project construction commenced in 1991 and subsequently entered into commercial operation in 1996.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 1 unit of pump turbine with 171MW nameplate capacity.
Voith Hydro Holding supplied 1 electric generator for the project. The generator capacity is 171 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.