Bogazkoy Combined Cycle Power Plant is a 390MW gas fired power project. It is located in Istanbul, Turkey. The project is currently active. It has been developed in single phase.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 390 | 390 | – | Active | Istanbul, Turkey | Dogal Enerji Uretim |
---|
Description
The project is developed and owned by Dogal Enerji Uretim. The company has a stake of 100%.
It is a CCGT with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel. The fuel is procured from BOTAS.
The Gas fired project consists of 1 steam turbine with 140MW nameplate capacity.
Contractors Involved
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of 9E gas turbines, each with 125MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.