Bostanlyk Pumped Hydro Project_EDF is a 200MW hydro power project. It is planned in Tashkent, Uzbekistan. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2027.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 200 200 Announced Tashkent, Uzbekistan Electricite de France; Uzbekhydroenergo

Description

The project is being developed by Electricite de France and Uzbekhydroenergo. These companies also have ownership stakes in the project.

Bostanlyk Pumped Hydro Project_EDF is a pumped storage project. The project cost is expected to be around $334.702m.

Development Status

The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2027.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

About Electricite de France

Electricite de France SA (EDF) is an integrated electricity provider. It has operations in the generation, transmission, distribution, energy supply, trading, energy services and other related services. The company produces electricity using nuclear, hydro, gas, fuel oil, coal and other renewable sources. EDF also carries out hydrocarbon exploration and production, waste recovery, gas supply, provides energy and environmental services, and manages heating and cooling networks, produces renewable energies, and industrial utilities. The company serves various residential, industrial, commercial, local authorities, companies and professionals in Africa, Asia, North America, Europe and other regions. EDF is headquartered in Paris, Ile-de-France, France.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.