Bugok (Dangjin) Combined Cycle Power Plant is a 1,503MW gas fired power project. It is located in South Chungcheong, South Korea. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1998 and subsequently entered into commercial operation in April 2001.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,503 | 1,503 | – | Active | South Chungcheong, South Korea |
---|
Description
GS Holdings and OQ SAOC are currently owning the project having ownership stake of 70% and 30% respectively.
It is a combined cycle gas turbine (ccgt) power plant.
Development Status
The project construction commenced in 1998 and subsequently entered into commercial operation in April 2001.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
GS E&C was selected to render EPC services for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase I) project. GS E&C was selected to render EPC services for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III) project. Siemens was selected to render EPC services for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III) project.
Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase I) is equipped with Siemens SCT6-4000F steam turbine. The phase consists of 1 steam turbine with 188MW nameplate capacity.
Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase I) is equipped with Siemens SGT6-4000F gas turbines. The phase consists of 2 gas turbines with 175MW nameplate capacity.
Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase II) is equipped with Siemens SCT6-4000F steam turbine. The phase consists of 1 steam turbine with 190MW nameplate capacity.
Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase II) is equipped with Siemens SGT6-4000F gas turbines. The phase consists of 2 gas turbines with 180MW nameplate capacity.
Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III) is equipped with Siemens SGT6-8000H gas turbine. The phase consists of 1 gas turbine with 275MW nameplate capacity.
Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III) is equipped with Siemens SST6-5000 steam turbine. The phase consists of 1 steam turbine with 140MW nameplate capacity.
Siemens supplied electric generator for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase I).
Siemens supplied electric generator for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase II).
Siemens supplied SGEN6-2000H electric generator for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III).
Siemens supplied steam boiler for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase I).
Doosan Heavy Industries & Construction supplied steam boiler for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase II).
Siemens supplied steam boiler for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III).
Amec Foster Wheeler supplied steam boiler for the Bugok (Dangjin) Combined Cycle Power Plant (Bugok (Dangjin) Combined Cycle Power Plant Phase III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.