Calenia Combined Cycle Power Plant is a 790MW gas fired power project. It is located in Campania, Italy. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2007.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 790 | 790 | – | Active | Campania, Italy | Calenia Energia |
---|
Description
The project was developed by Calenia Energia. Axpo Holding and Hera are currently owning the project having ownership stake of 85% and 15% respectively.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from SNAM Rete Gas.
Development Status
The project got commissioned in 2007.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Ansaldo Energia was selected to render EPC services for the gas fired power project.
Calenia Combined Cycle Power Plant (Calenia Combined Cycle Power Plant Block I) is equipped with Ansaldo Energia AE94.3A gas turbine. The phase consists of 1 gas turbine with 263MW nameplate capacity.
Calenia Combined Cycle Power Plant (Calenia Combined Cycle Power Plant Block I) is equipped with Ansaldo Energia MT15 steam turbine. The phase consists of 1 steam turbine with 132MW nameplate capacity.
Calenia Combined Cycle Power Plant (Calenia Combined Cycle Power Plant Block II) is equipped with Ansaldo Energia AE94.3A gas turbine. The phase consists of 1 gas turbine with 263MW nameplate capacity.
Calenia Combined Cycle Power Plant (Calenia Combined Cycle Power Plant Block II) is equipped with Ansaldo Energia MT15 steam turbine. The phase consists of 1 steam turbine with 132MW nameplate capacity.
Ansaldo Energia supplied WY23Z-199LL, Air-Cooled electric generator for the project.
Ansaldo Energia supplied WY21Z-092LLT, Air-Cooled electric generator for the project.
Ansaldo Energia supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.