Cameron Falls Headworks is an 87MW hydro power project. It is located on Nipigon river/basin in Ontario, Canada. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1920.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 87 | 87 | – | Active | Ontario, Canada | Hydro-Electric Power Commission of Ontario |
---|
Description
The project was developed by Hydro-Electric Power Commission of Ontario and is currently owned by Ontario Power Generation with a stake of 100%.
The hydro reservoir capacity is 72.78 million cubic meter.
Development Status
The project got commissioned in 1920.
Contractors Involved
The turbines for the hydro power project have been supplied by Andritz Hydro, Eaton Vickers Systems and Voith Hydro Holding.
The electric generators for the project were procured from Andritz Hydro and Voith Hydro Holding.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.