Changzhou Power Plant is a 1,200MW coal fired power project. It is located in Jiangsu, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in May 2006.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,200 | 1,200 | – | Active | Jiangsu, China |
---|
Description
Guodian Changzhou Power Generation, China Resources Power Holdings, Jiangsu Guoxin Asset Management Group and Changzhou Investment Group are currently owning the project having ownership stake of 51%, 25%, 20% and 4% respectively.
It is a steam turbine power plant that is used for Baseload.
Development Status
The project got commissioned in May 2006.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Shanghai Power Erection No.2 was selected to render EPC services for the coal fired power project.
Shanghai Turbine was selected as the turbine supplier for thermal power project. The project consists of 2 units of N630-24.2 / 566/566 turbines, each with 600MW nameplate capacity.
Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Changzhou Power Plant (Changzhou Power Plant Unit I).
Shanghai Electrical Machinery Group supplied QFSN-600-2M electric generator for the Changzhou Power Plant (Changzhou Power Plant Unit II).
Harbin Boiler supplied steam boiler for the Changzhou Power Plant (Changzhou Power Plant Unit I).
Harbin Boiler supplied steam boiler for the Changzhou Power Plant (Changzhou Power Plant Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.