Datang Anyang Power Plant is a 600MW coal fired power project. It is located in Henan, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in August 2009.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 600 | 600 | – | Active | Henan, China |
---|
Description
The project is currently owned by Henan Branch.
It is a Steam Turbine with Cogen power plant. The fuel is procured from Hemei Group.
Development Status
The project got commissioned in August 2009.
Contractors Involved
Dongfang Turbine was selected as the turbine supplier for thermal power project. The project consists of 2 units of C300 / 235-16.7 / 0.343 / 537/537 turbines, each with 300MW nameplate capacity.
DEC Dongfang Electric Machinery supplied QFSN 300-2-20B electric generator for the Datang Anyang Power Plant (Datang Anyang Power Plant Unit I).
DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Datang Anyang Power Plant (Datang Anyang Power Plant Unit II).
Dongfang Boiler Group supplied steam boiler for the Datang Anyang Power Plant (Datang Anyang Power Plant Unit I).
Dongfang Boiler Group supplied steam boiler for the Datang Anyang Power Plant (Datang Anyang Power Plant Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.