Datang Gaojing Gas Fired Power Plant is a 1,380MW gas fired power project. It is located in Beijing, China. The project is currently active. It has been developed in single phase. The project construction commenced in 2012 and subsequently entered into commercial operation in 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,380 | 1,380 | – | Active | Beijing, China |
---|
Description
The project is currently owned by Datang International Power Generation.
It is a ccgt with cogen power plant.
The project generated 5,997,900MWh of electricity. The project cost is $897m.
The Gas fired project consists of 2 steam turbines.
Development Status
The project construction commenced in 2012 and subsequently entered into commercial operation in 2014.
Contractors Involved
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 3 units of 9F.05 gas turbines.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.