Datang Lueyang Power Plant Unit I is a 330MW coal fired power project. It is located in Shaanxi, China. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in July 2007.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 330 330 Active Shaanxi, China

Description

The project is currently owned by Datang Lueyang Power Generation.

It is a Steam Turbine power plant.

The project cost is $223.898m.

The Coal fired project consists of 1 steam turbine with 330MW nameplate capacity.

Development Status

The project got commissioned in July 2007.

Contractors Involved

Beijing Heavy Electric Machinery Turbine Works supplied T255-460 electric generator for the project.

Babcock & Wilcox Beijing supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.