Davenport – Bulli Creek HVDC Line is a 400kV overhead line with a length of 1420km from Davenport, South Australia, Australia, to Bulli Creek, Queensland, Australia.
The project, which is currently in the planning stage, is expected to be commissioned in 2024.
Description
Davenport – Bulli Creek HVDC Line is an overhead line that will be operated by ElectraNet Pty. The line will carry direct current (AC) through double circuit cable.
Davenport – Bulli Creek HVDC Line project development status
The construction works on the Davenport – Bulli Creek HVDC Line project will be commenced in 2021 and commissioning is expected in 2024.
About ElectraNet Pty
ElectraNet Pty Ltd (ElectraNet) is a provider of transmission network services. It builds, owns, operates and maintains high-voltage electricity transmission network. The company offers various energy and infrastructure solutions, including asset, project and contract management services; asset monitoring and reporting; land management; and asset performance insight. ElectraNet plans, funds, designs, construct, commissions, operates and maintains transmission assets in South Australia. It serves power generators, South Australia’s electricity distributor, SA Power Networks and directly-connected industrial customers.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.