Ferrybridge Multifuel Plant I is a 70MW biopower project. It is located in England, the UK. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in July 2015.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 70 | 70 | – | Active | England, the UK |
---|
Description
The project is co-owned by SSE and Wheelabrator Technologies, with their respective ownership stake of 50% each.
The project supplies enough clean energy to power 160,000 households. The project cost is $505.152m.
The process of combustion has been adopted in this combined heat and power (CHP) project to release the stored energy from the feed. Industrial waste, municipal solid waste and wood by-product are used as a feedstock to power the project.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in July 2015.
Power Purchase Agreement
The power generated from the project is sold to SSE under a power purchase agreement.
Contractors Involved
Hitachi Zosen Inova was selected to render EPC services for the biopower project.
Hitachi Zosen Inova supplied steam boiler for the project. The boiler installed at the site has a capacity of 104TPH. The temperature witnessed inside the boiler is around 427°C. The steam is pressurized inside the boiler at 72bar.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.