Fort Drum Biomass Power Plant is a 60MW biopower project. It is located in New York, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in May 2013.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 60 60 Active New York, the US

Description

The project is currently owned by ReEnergy Holdings with a stake of 100%.

The project generates 422GWh electricity and supplies enough clean energy to power 55,000 households. The project cost is $180.458m.

Forest residue which is a kind of agricultural by-product is used as a feedstock to power the project.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in May 2013.

Power Purchase Agreement

U.S. Department of Defense and US Defense Logistics Agency are the power offtakers from the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.