Fulaerji 2 Coal Fired Power Plant is a 1,200MW coal fired power project. It is located in Heilongjiang, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,200 | 1,200 | – | Active | Heilongjiang, China |
---|
Description
The project is currently owned by China Huadian Corporation Fulaerji Power Generation Plant.
It is a steam turbine power plant.
Development Status
The project got commissioned in 1982.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit I) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit II) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit III) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit IV) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit V) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit VI) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Harbin Electric Machinery supplied QFQS-200 electric generator for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit I).
Harbin Electric Machinery supplied QFQS-200 electric generator for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit II).
Harbin Electric Machinery supplied QFQS-200 electric generator for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit III).
Harbin Electric Machinery supplied QFQS-200 electric generator for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit IV).
Harbin Electric Machinery supplied QFQS-200 electric generator for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit V).
Harbin Electric Machinery supplied QFQS-200 electric generator for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit VI).
Harbin Boiler supplied steam boiler for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit I).
Harbin Boiler supplied steam boiler for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit II).
Harbin Boiler supplied steam boiler for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit III).
Harbin Boiler supplied steam boiler for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit IV).
Harbin Boiler supplied steam boiler for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit V).
Harbin Boiler supplied steam boiler for the Fulaerji 2 Coal Fired Power Plant (Fulaerji 2 Coal Fired Power Plant Unit VI).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.