Gezende is a 159MW hydro power project. It is located on Goksu river/basin in Mersin, Turkey. The project is currently active. It has been developed in single phase. The project construction commenced in 1979 and subsequently entered into commercial operation in 1994.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 159 159 Active Mersin, Turkey

Description

The project is currently owned by Devlet su Isleri Genel Mudurlugu.

Gezende is a reservoir based project. The project generated 528 GWh of electricity.

Development Status

The project construction commenced in 1979 and subsequently entered into commercial operation in 1994.

Contractors Involved

UCM Resita was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 53MW nameplate capacity.

Hydro Engineering S.A. Resita supplied electric generator(s) for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.